Pyrometallurgy

پیرومتالورژی

Pyrometallurgy

Our Pyrometallurgy Projects are as follows:

Sarcheshmeh Nickle Plant Project

The aim of this project is to build a plant with a production capacity of 112 tons of nickle cathode and 550 tons of cathode copper per day.

Copper

Iran has great potential for development in mining industry, including copper industry ...

Sirjan Complex Direct Reduction Plant Project

The aim of this project is to build a direct reduction unit by MIDREX method and with a capacity of 960,000 tons per year to produce Direct Reduced Iron (DRI). Canymes Company with technical and engineering experts in steel and other related industries has been chosen as Management Contract.

Khatoon-Abad Copper Smelting Plant Expansion Project

The aim of this project is to develop and modernize Khatoon Abad Copper Smelting Plant with a production capacity of 120,000 tons of anode copper per year.

Ahar Lime Plant Project

The aim of this project is to build a lime plant for producing Quicklime (150 TDP) and a hydration plant for producing Hydrated Lime (10 TPH) in Azarbaijan province.

Sirjan Complex Steel Making Plant Project

The aim of this project is to build a smelting and casting plant by electrical arc furnace (EAF) with a capacity of 1,000,000 tons of billet per year. Canymes Company with technical and engineering experts in steel and other related industries has been chosen as Management Contract.

About Us

Canymes was established in 2001 as a leading general contractor in the field of mine and metal specifically in copper and steel supported by National Iranian Copper Industries Pension Fund Institute. After 19 years of experience and relying on technical knowledge of Iranian experts; today, Canymes operates as a leading general contractor in EPC and MC projects by applying cutting edge technology. Canymes seeks to outshine rivals by technical knowledge and successful experience in projects. In this way, by using capabilities of domestic companies and cooperate with foreign companies, it will be achievable to be one of the most brilliant brands in the field.

Sungun Copper Heap Leaching Project

The aim of this project is to build a hip leaching plant in the Songun Copper Complex with a production capacity of 3,000 tons per year of cathode copper.